Atlantic pavilion Contract sum £350 M&E

 

A sympathetic M&E installation to a listed building in the albert dock Liverpool, the objective was to provide a functional yet pleasant environment for the Plus Dane work force.  This has been achieved by a collective effort from our in house design team to the site engineers who have gone above and beyond.

 

List of disciplines below:-

 

  • Distribution
  • Bus bar track and desk modules
  • Structured wiring
  • CCTV
  • Access control
  • Panic alarm
  • Lighting and controls
  • Small power
  • Fire alarm
  • Ventilation
  • Air conditioning
  • Domestic hot and colds
  • Draining including pumped drains